Please enter a valid full or partial manufacturer part number with a minimum of 3 letters or numbers

    DSASW00190218.pdf by Glenair

    • Fiber Optic Tool Kits The BAND-IT® Clamping System EMI Shield Termination Instructions 1. Prepare Cable Braid for termination process (Figure 1). 2. Push Braid forward over Adapter Retention
    • Original
    • Unknown
    • Unknown
    • Unknown
    • Powered by Findchips Logo Findchips

    DSASW00190218.pdf preview

    User Tagged Keywords

    Glenair BRAID mark CA
    Supplyframe Tracking Pixel